Phase 1: Construction

Hover over the camera icons to see construction photos and captions corresponding to that angle.
Entrance
07.06.05
Preparing the entrance to the labyrinth.
Approach
07.06.05
The poured slab is ready for graphic application.
Path
07.06.05
Prepping the labyrinth path.
Pouring Concrete
06.30.05
Preparing for the next load of concrete.
Pouring Concrete
06.30.05
The final section of concrete is added.

Phase 1: Construction

June 30 – July 6, 2005

Labyrinth Illustration
Preparing for the next load of concrete.
The final section of concrete is added to the labyrinth.
The finished poured slab prior to graphic application.
Prepping the labyrinth approach.
Preparing the entrance to the labyrinth.